您好,欢迎进入我们网站!
wendy@yancon.com / sales@yancon.com +86-532-81195199 EN
产品中心
当前位置:首页> 产品中心
10000L Large Water Tanks Blow Molding Machine
供应能力:
上市时间:
查看: 520
10000L Large Water Tanks Blow Molding Machine
查看: 520
详情

10000L three layer Blow Molding Machine

1.Adopt Siemens PLC,Siemens Touch Screen and MOOG to make the operation easy. 
2.Adopt progressive hydraulic system by ourselves,easy to control.
3.Adopt inverter to control the clamping system,saving a lot of energy.
4.The technology of DIe Head is the same with Germany.
Large Water Tank Blow Molding Machine
5.Configuration:
 


PARISION CONTROL THINCKNESS CONTROL
MOOG JAPAN
PLC SEIMENS GERMANY
TEMPERATURE CONTROL MODULE SEIMENS GERMANY
SERVO VALVE & SERVO TRANSDUCER MIRAN ITALY
INVERTER SEIMENS GERMANY
HYDRAULIC OIL SEAL DZ TAIWAN
INTERMEDIATE RELAY OMRON JAPAN
PNEUMATIC VALVE AIRTECH TAIWAN
HYDRAULIC PUMP & VALVE YUKEN JAPAN
PNEUMATIC SWITCH & CONTACTOR SEIMENS GERMANY
HYDRAULIC MOTOR & SCREW MOTOR SEIMENS GERMANY
REDUCER GUOMAO CHINA


6.Specification
 

No
specifications 10000 Liter


Model No. 3 layers


Processing material HDPE/HMWHDPE
1 Extruders Gear Box Type Hard surface
Max Screw Speed 60RPM
2 Accumulator Die Head Heating Load 100kw
Die-Core size [ Min / Max] ∮500-1100MM
Inverter Siemens
Max. parison weight 300KG
3 Moulding Clamping Unit CLAMPING PLATEN Size 3000X4000mm
MAX MOLD SIZE 2750X4000mm
Mould Clamping Force 6000KN
Mould Thickness 1700-2400
4 Stretching and Blowing Unit Spreading stroke 400-1200mm
Vertical stroke max. 300mm
5 Electrical Control Panel Thickness controller 100 points Moog
Main Operation Panel Siemens
Die Head Control Temperature Control Siemens
6 Hydraulic System Hydraulic Drive motor (Main) 55KW
Hydraulic Drive Motor (Parison Control) 11kw
Oil Tank Capacity 1800Lx2
7 Gripper  Gripped stroke 650mm
8 Hopper Loader Loader 800kg/H 3pcs
Hopper 50kg 3pcs
9 Production rate
Of 10000 ltr.
Productivity 2-3pcs/h
Product Weight 170-180kg
10 Delivery period
6 months
11 Weight of Machine
190Ton

Size of Machine [L x W x H ]  (M) 18mx14mx10m
12 Total power
680KW
13 Average power Consumption
420KW


DELIVERY TIME 
6 months after the down payment;
 
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;
The training is free of charge;

 
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week in the Buyer's factory.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.

 
GUARANTEE
The guarantee time is one and half year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.


留言
姓名:
电话:
邮箱:
内容: